ANALYSIS OF FACTORS AFFECTING THE TIME OF THE CAR ASSEMBLY PROCESS

Abstract

Modern car industry high accuracy, efficiency and speed demand does. Competitive market under the circumstances every one car working issuer working release time reduce through expenses reduce and profit to increase movement This view​ in terms of cars assembly​ process on time impact doer factors study extremely important.

Source type: Journals
Years of coverage from 2022
inLibrary
Google Scholar
 
Branch of knowledge
f
93-95

Downloads

Download data is not yet available.
To share
Crossref
Сrossref
Scopus
Scopus

Abstract

Modern car industry high accuracy, efficiency and speed demand does. Competitive market under the circumstances every one car working issuer working release time reduce through expenses reduce and profit to increase movement This view​ in terms of cars assembly​ process on time impact doer factors study extremely important.


background image

https://ijmri.de/index.php/jmsi

volume 4, issue 7, 2025

93

ANALYSIS OF FACTORS AFFECTING THE TIME OF THE CAR ASSEMBLY

PROCESS

G‘. M. Bahodirov

Assistant, Andijan State Technical institute

Abstract:

Modern car industry high accuracy, efficiency and speed demand does. Competitive

market under the circumstances every one car working issuer working release time reduce

through expenses reduce and profit to increase movement This view​

in terms of cars

assembly​ process on time impact doer factors study extremely important.

Key words:

cars, collection

process, time, work release technology, worker strength, caution

parts.

Car working release types

- Individual (order) based on) Output: Small voluminous and high customized products working

This type of working in the release assembly​ duration relatively long will be.

- Small series working Release: Unknown in quantity cars one kind in configuration working is

released.

Car gathering​ line appearance.

- Public working Output: Large car companies by wide This type of​ working release process

high at the level automated and assembly​ duration the most short is considered.

Car assembly​ process essence and main stages

- Body parts assembly​ and welding;

- Paint​ their work done increase;

- Engine , transmission box, chassis elements installation;​

- Electronic systems connect and adjustment;


background image

https://ijmri.de/index.php/jmsi

volume 4, issue 7, 2025

94

- Final

quality

control

and test.

Cars

assemb

ly​

process

on time

one

how

much

factors

impact

These

factors

workin

g release technology, worker power skill, caution parts and materials supply , product complexity,

quality control processes and internal logistics and working release environment organization to

be example if we bring It will be

.

Crying​ on time the most big impact indicating from factors one this working release Robotized

technology. systems and automated conveyor lines application​

collection time much For

example, "Toyota Production System" progressive​ systems short time inside many numerical

cars to collect opportunity gives.

Workers qualification and experience is also important from factors is one. High qualified

workers short time inside complicated tasks to do capable They are divided into. Workers

permanent education​ and motivation working release efficiency increases.

Necessary caution parts and of materials own​ on time delivery to be given collection process

not to be late "Just- in -Time" (JIT) system through companies warehouse expenses reduces, but

this in the system small The interruptions are also large. to delays take arrival possible.

Car design and configuration complexity assembly​

on time directly impact does. Complex

electronic systems, special orders, additional​

options many if, collection the deadline is the

same suitable accordingly increases.

At Uz Auto Motors cars quality inspection process.

Quality control processes are also collected on time impact does. Quality control to do stages

many​

if so, this working release of time to stretch take arrival possible. However quality

important happened​ for this processes working issuer image save to stay service does.

Internal logistics and working release environment organization cars are also assembly​ to the

process directly impact The factory​

inside logistics – parts right​

placement, convenient

movement roads and ergonomic work places – all this factors work to the speed impact does. Not

optimized working release environment time to disappear take is coming.

Car assembly​

duration reduce — this whole working release system optimized shows.

Crying​ stages automation , lean technologies current module​ ​ collection from the method

use through efficiency noticeable at the level increases. With this together, working release This

is also the type to the process directly impact shows . Public​ working in the release time the

most short efficiency​ ​ ​ is high. In the future digital technologies wide current to grow this

about achievements further to strengthen service does.

Crying​ process efficiency following indicators based on analysis is done:

- One the car assembly​ for expendable time ( tact) and cycle time );

- Workers fertility ;

- Quality control results ( repeat) processing necessary was​ cars number );


background image

https://ijmri.de/index.php/jmsi

volume 4, issue 7, 2025

95

- Equipment efficiency;

Statistical to the information according to, public working release in the processes one the car

collection for average 15-20 hours time demand Modern​ ​ robotic on the lines and this time

up to 10-12 hours is being reduced.

Conclusion

: Cars assembly​ process many to factors related is, this factors mutual complicated

in touch will be . Production release technology, worker power skill , caution parts delivery

given, the car complexity, quality control and internal logistics assembly​

of time efficiency

determinant main These factors are right​ management through car working producers market

requirements flexible and effective become remains.

References:

1. Boothroyd, G., Dewhurst, P., & Knight, W. A. (2010). Product Design for Manufacture and

Assembly. CRC Press.

2. Kalra, A., & others. (2016). Productivity Improvement in Assembly Line of Automobile

Industry by Reducing Cycle time of Operations. ResearchGate. DOI: 10.9790/1684-

14030597104.

3. Mohammed, A. S., & others. (2017). Analysis For Determining Factors That Make Good

Design Process In Automotive Manufacturing Organization. IOSR Journal of Mechanical

and Civil Engineering, 14(3), 97-104.

4. Tasdemir, C., & Gazo, R. (2018). A Systematic Literature Review for Better Understanding

of Lean Driven Sustainability. Sustainability, 10(7), 1-54.

5. Wen, X., Cao, H., Hon, B., Chen, E., & Li, H. (2021). Energy value mapping: A novel lean

method to integrate energy efficiency into production management. Energy, 217(C).

6. Powell, D., Romero, P., & Gaiardelli, P. (2022). New and Renewed Manufacturing

Paradigms for Sustainable Production. Sustainability, 14(3), 1-6.

References

Boothroyd, G., Dewhurst, P., & Knight, W. A. (2010). Product Design for Manufacture and Assembly. CRC Press.

Kalra, A., & others. (2016). Productivity Improvement in Assembly Line of Automobile Industry by Reducing Cycle time of Operations. ResearchGate. DOI: 10.9790/1684-14030597104.

Mohammed, A. S., & others. (2017). Analysis For Determining Factors That Make Good Design Process In Automotive Manufacturing Organization. IOSR Journal of Mechanical and Civil Engineering, 14(3), 97-104.

Tasdemir, C., & Gazo, R. (2018). A Systematic Literature Review for Better Understanding of Lean Driven Sustainability. Sustainability, 10(7), 1-54.

Wen, X., Cao, H., Hon, B., Chen, E., & Li, H. (2021). Energy value mapping: A novel lean method to integrate energy efficiency into production management. Energy, 217(C).

Powell, D., Romero, P., & Gaiardelli, P. (2022). New and Renewed Manufacturing Paradigms for Sustainable Production. Sustainability, 14(3), 1-6.